← All articles

Database migrations and backups: verify the restore

Prepare a data migration with field mapping, trial imports, validation, backups, a cutover window and a recovery plan.

A backup file is useful only if you know how to restore a working system from it. Database migration adds another question: whether transferred records preserve their meaning and relationships, not merely an approximate row count.

Run trial migrations and restores in a separate environment. Define how success will be checked before changing production data.

Prepare a data map

Describe source fields, destination fields, types and transformation rules. Check encoding, dates, time zones, missing values and identifiers. When combining systems, decide how duplicate customers and repeated reference numbers are handled.

Preserve relationships. An order linked to the wrong customer or a file detached from its document can pass a technical import while producing an incorrect business result.

Rehearse with a separate copy

Run the import in a test environment and record duration and failures. Check more than totals: search for a customer, open a historical order and generate an important report.

Compare aggregates that matter to the operation. Differences should be explainable through transformation rules or specific problematic records. A command completing successfully does not by itself prove that the resulting data is correct.

Separate backup strategy from migration

PostgreSQL documents several backup approaches, including SQL dumps, filesystem backups and continuous archiving. The appropriate method depends on recovery requirements and configuration; the procedures are not interchangeable.

  • What is included: the database, files and necessary configuration.
  • Where the copy is stored and who can read it.
  • Retention and monitoring of failed backup jobs.
  • When a restore was last tested.
  • Acceptable recovery time and loss of recent changes.

Plan the cutover

Decide whether writes will pause and how changes since the last trial import will be transferred. Assign someone to confirm the outcome. Recovery planning must also account for records created after the switch.

MSS can prepare migrations, validation and recovery procedures. The initial discussion starts with data structure and volume, acceptable downtime and critical operations.

Documentation and sources

What should your software do better?

Describe the task, the system or the idea. We will clarify the scope and propose the next steps.

Call us · +359 89 341 4446

If we miss your call, expect a call back within 2 hours.

Prefer to write?